Quick reference
PMP® glossary
CPI, SPI, EVM formulas, and the vocabulary you'll actually see on the exam — searchable, no fluff.
Actual CostAC
EVMThe realized cost incurred for the work actually performed on an activity.
Backlog Refinement
AgileThe ongoing activity of reviewing and detailing backlog items so they're ready to be pulled into upcoming work.
Budget at CompletionBAC
EVMThe total planned budget for all authorized work on the project.
Change Control BoardCCB
Scope & ScheduleA formally chartered group responsible for reviewing, approving, or rejecting changes to the project baseline.
Contingency Reserve
RiskBudget or time set aside for identified risks that are accepted, sized to the project's risk exposure. Part of the cost baseline.
Cost Performance IndexCPI
EVMCost efficiency of budgeted resources. CPI > 1 means under budget; CPI < 1 means over budget; CPI = 1 means on budget.
CPI = EV / AC
Cost VarianceCV
EVMHow far actual spend is from the value of work completed. Negative means over budget.
CV = EV − AC
Cost-Reimbursable Contract
ProcurementA contract type where the buyer reimburses the seller's actual costs plus a fee, placing more cost risk on the buyer.
Crashing
Scope & ScheduleA schedule compression technique that adds resources to shorten activity duration, usually increasing cost.
Critical Path
Scope & ScheduleThe longest sequence of dependent activities that determines the shortest possible project duration. Delaying any activity on it delays the project.
Definition of DoneDoD
AgileThe shared, agreed checklist of criteria a work item must meet to be considered complete and releasable.
Earned ValueEV
EVMThe value of the work actually completed, expressed in terms of the approved budget.
Estimate at CompletionEAC
EVMThe forecasted total cost of the project given current performance. Several formulas exist depending on the assumption; the most common assumes current cost performance continues.
EAC = BAC / CPI
Estimate to CompleteETC
EVMThe expected cost needed to finish all remaining project work.
ETC = EAC − AC
Fast Tracking
Scope & ScheduleA schedule compression technique that performs activities in parallel that were originally planned in sequence. Increases risk but doesn't add cost.
Fixed-Price Contract
ProcurementA contract type where the total price is set in advance, placing cost-overrun risk primarily on the seller.
Float (Slack)
Scope & ScheduleThe amount of time an activity can be delayed without affecting the project finish date (total float) or the next activity's start (free float). Critical path activities typically have zero float.
Kanban
AgileA visual, flow-based method that limits work in progress and pulls work through stages as capacity allows, rather than working in fixed-length iterations.
Management Reserve
RiskBudget or time held back for unforeseen (unidentified) work, controlled by management and outside the performance measurement baseline.
Planned ValuePV
EVMThe authorized budget assigned to scheduled work as of a given point in time.
RACI MatrixRACI
StakeholdersA responsibility assignment chart mapping who is Responsible, Accountable, Consulted, and Informed for each task or deliverable.
Risk Appetite
RiskThe general level of risk exposure an organization or stakeholder is willing to accept.
Risk Register
RiskA document listing identified risks, their analysis (probability, impact), owners, and planned responses.
Rolling Wave Planning
Scope & ScheduleProgressive elaboration where near-term work is planned in detail while future work is kept at a higher level until more information is available.
Schedule Performance IndexSPI
EVMSchedule efficiency of work completed. SPI > 1 means ahead of schedule; SPI < 1 means behind schedule; SPI = 1 means on schedule.
SPI = EV / PV
Schedule VarianceSV
EVMHow far ahead or behind schedule the project is, in value terms. Negative means behind schedule.
SV = EV − PV
Scope Creep
Scope & ScheduleUncontrolled expansion of project scope without corresponding adjustments to time, cost, or resources — usually a sign of weak change control.
Servant Leadership
StakeholdersA leadership style focused on removing obstacles for the team and enabling their performance, common in agile environments.
Sprint
AgileA fixed, short time-box (commonly 1–4 weeks) in Scrum during which a usable increment is created.
Stakeholder Register
StakeholdersA document identifying project stakeholders along with their interests, influence, and engagement level.
Time and Materials ContractT&M
ProcurementA hybrid contract type that pays for labor at a set rate plus materials, often used when scope isn't fully defined up front.
To-Complete Performance IndexTCPI
EVMThe cost efficiency required on remaining work to hit the budget (or a revised EAC). Above 1 means the remaining work must be done more efficiently than planned.
TCPI = (BAC − EV) / (BAC − AC)
Variance at CompletionVAC
EVMThe projected budget surplus or deficit at project completion.
VAC = BAC − EAC
Velocity
AgileThe amount of work (often in story points) a team completes per sprint, used to forecast future capacity.
Work Breakdown StructureWBS
Scope & ScheduleA hierarchical decomposition of the total scope of work into smaller, manageable components, down to work packages.
Ready to put these to work?
Practice questions apply these concepts in real scenarios, not flashcards.
Start practicing freePMPracticeLab is an independent prep tool, not affiliated with PMI. PMP is a registered mark of PMI.